Facility Commissioning

Computers & TechnologyTechnology

  • Author Henry Mcallister
  • Published May 27, 2011
  • Word count 449

You just spent hundreds of thousands of dollars on creating a server room or millions of dollars developing a Tier III data center. Now, you're ready to start operations… or are you? Do you know if your facility was built and is performing to specifications? Are you positive your mission-critical infrastructure was completely tested as an integrated system? Did you just perform "Start-up" or did you conduct a fully documented, comprehensive integrated systems test, simulating numerous run and failure modes? Contrary to popular belief, facility design doesn’t end where the builders take over. Instead, advanced facilities must be commissioned to ensure proper efficiency and operation prior to opening day.

A number of components and systems power, cool and protect your mission-critical facility. It really is the sum of these pieces that makes an integrated infrastructure. A deficiency in 1 component can compromise the operation and performance of the whole. crucial infrastructure Solutions' Commissioning Services ensure that every component of the mission-critical infrastructure performs precisely as prescribed, individually and as an integrated system. We make certain that your data center and mission-critical facility's build-out matches the style intent.

All MEP systems needs to be tested prior to personal computer equipment enters the building to assure operability. Load banks are employed to simulate demand, as well as the utility will likely be allowed to fail, requiring the elevation of back-up generators. Running the UPS program and batteries eliminates any unwanted surprises, while an integrated systems test evaluates the data center’s mechanical and electrical systems simultaneously to measure overall impact on the facility when both single and numerous components fail at once. This testing will be completed in a controlled environment allowing you total peace of mind.

An effective datacenter or mission-critical facility Commissioning Service must employ current best practices. We validate and document that all facility's systems have been installed and are operating in accordance with design specifications, and that every piece of equipment, subsystem and program will function properly in the application for which it was intended.

The commissioning spans all the developmental stages of a critical facility, whether the facility is being built from the ground up or rebuilt as a renovation project. Throughout each and every stage of the process, validation is performed to assure that your style requirements are met or exceeded.

Facility commissioning is a critically important step toward ensuring the success and operational longevity of a mission-critical installation.

Information Center Commissioning is a systematic process:

  • Records the Facilities Designer Intent

  • Documents the Facility Design Team's Basis of Style

  • Develops Facility Commissioning Specifications

  • Validates the Functional Performance of Each Individual Electrical and Mechanical Component

  • Validates the Overall Functional Performance of the Program as a Whole

Critical Facility Commissioning Services and Other Datacenter Solutions by Critical Infrastructure Solutions