Shanghai World Financial Center Construction
- Author Paul Peshkov
- Published February 9, 2010
- Word count 706
Shanghai World Financial Center construction was one structure worth researching. As anyone could imagine, building such a structure as Shanghai World Financial Center requires knowledge that has not been know before-but with technology and testing the project was completed on August 28, 2008
The importance of developing building technologies to resists earth movement and high winds in high-rise construction holds an important value. Initially planned to be the world's tallest building, but because of economic situation, the Asian Financial Crises, and other delays, The Shanghai World Financial Center, located in Shanghai, China, is eye appealing. While it was in the building process, the building dimensions were increased for couple reasons that we know of. After a decision to increase gross area of the WFC in Shanghai by 15%, increase in overturning moment from wind forces of about 25% came as well. A diagonal bracing was also used. With the design changes, the service core shear wall was achieved and there came the decrease in the amount of steel needed for the robust structure.
The first structure was called the mega structure, which in reality consists of major structural columns, the major diagonals, and the belt trusses. The second one was a concrete walls of the service core I mentioned above. The third system was a relationship between concrete wall of the service core and the mega-columns, that were made by the outrigger trusses...
As the final design of LERA (Leslie E. Robertson Associates), Shanghai World Financial Center construction consisted of three relatively narrow columns, compared to seventeen wide columns. An important area to mention is how the stiffness of the perimeter and trusses has movement, as well as shears in the concrete walls of the service core, can be increased or decreased. The whole robust design is smiler that of the, previous, World Trade Center in NY. The wind engineering results were different compared to that of the World Trade Center in NY, based on extensive wind testing.
The earthquake engineering for the Shanghai World Financial Center construction was extensive. The design allows for a 200 year period for typhoon return and a 2000 year return on earthquake. In the process of its foundation construction, temporary support for both mat and below-grade concrete floors were made because of the use of top-down construction method, H-piles large steel sections extended from the piling to the ground surface...
Other issues that come with this high rise were the cost, as in any project. Because the pile cut-off was well below grade, it was costing too much to reinforce existing pile. LERA determined that the current pile foundation system they had in place could accept a larger expansion; they only had the issue of cutting the weight of the original building by 10% or more; the other aspect they had to do was to redistribute the loads to the pile so that increased lateral loads the come from wind and earthquake can be surpassed.
For Shanghai World Financial Center construction or other building areas where winds are a problem, the seismic effects typically include:
-
High base overturning moment and foundation design (wind, seismic)
-
High shear demand near base (seismic)
-
High gravity stresses in the vertical elements (and use of high-strength materials) to minimize structural sizes for
economic structural design and to maximize net floor area
-
Differential axial shortening under gravity forces, including effect on floor slope and outrigger force demands
-
Development of ductility in elements at the base of a structure under high compressive gravity stress (seismic)
-
Controlling lateral accelerations (wind)
-
Controlling story drift (wind, seismic)
-
Controlling damage so as to enable repair (seismic)
-
Ensuring ductile energy dissipation mechanisms and preventing brittle failures (seismic)
Each geographical location requires specific, special requirement, to be developed and tested, when the project is breaking new ground, like The Shanghai World Financial Center construction... Although other buildings were structured in that geographical location, but not with the same height and greatness...
Shanghai World Financial Center Construction. Paul Peshkov is a distributor, business developer, and a general contractor. As a favorite hobby, Mr. Peshkov is extensively involved in studying Alternative Medicine. He enjoys helping people reach their full potential in life. For more info on his latest developments visit http://www.PaulPeshkov.com
Article Source: http://EzineArticles.com/?expert=Paul_Peshkov
Shanghai World Financial Center Construction. Paul Peshkov is a distributor, business developer, and a general contractor. As a favorite hobby, Mr. Peshkov is extensively involved in studying Alternative Medicine. He enjoys helping people reach their full potential in life. For more info on his latest developments visit http://www.PaulPeshkov.com
Article source: https://articlebiz.comRate article
Article comments
There are no posted comments.
Related articles
- “Shadows of Youth: How The Graduate Still Echoes Across a Lifetime.”
- ISNation Featured on Globe & Mail, MarketWatch, and YahooFinance
- How Financial Platforms Empower Smarter Trades
- "Louise Brooks: The Icon Who Defied Hollywood."
- Krishna in the Forest – The Sacred Inspiration Behind Mogul Interior’s Carved Doors
- Nature’s Harmony Collection – Signature Carved Doors
- Labor Day Sale: Heritage Revival Collection by Mogul Interior
- Refined Rustic Luxury Meets Vintage Elegance: A Global Ranch Home
- “Play It Again, World: Why Casablanca Still Speaks to Us All These Years Later.”
- The Merits of Bacon and Eggs for Breakfast
- “From Spotlight to Parliament: The Fearless Journey of Glenda Jackson.”
- Is a Farm in Tennessee the Life for Me?
- “Drifting Rooms and Vanishing Faces: Confronting the Abyss in The Father.”
- Understanding Men’s Lacrosse: A Beginner’s Guide to the Sport
- Why Knowledge Retention Is Every Team’s Secret Weapon
- From Messy to Mission-Aligned: The Tech Stack That Gets Teams Back on Track
- Fix the Schedule, Save the Season: Why Smart Leagues Start With Smart Calendars
- From Cart Chaos to Symphony: Why Scalable Commerce Orchestration Is the Conductor You Need
- The High-Tech Future of Fleet Maintenance
- Big Vision, Small Budget? Enter the Fractional Integrator
- Stale Content Doesn’t Rank — or Convert
- Welcome to the Big Leagues
- Antique Statements for the Home: From Doors to Decor
- Statement Bedroom Door Styles to Elevate Your Space
- What is a Stairlift and How Does It Work?
- Mastering Cinematic Camera Movement: The Art and Science of Fluid Heads
- "Grace Beyond Glamour: Audrey Hepburn's Timeless Reign in a World of Glitter and Excess."
- “The Relentless Ascent of Tom Cruise: Hollywood’s Tireless Risk-Taker.”
- How To Write An Effective Bid For A Contract Opportunity
- How Listening To Music Can Be Surprisingly Therapeutic